Lake Siskiyou Campground
Siskiyou County, CA
Civil-Environmental Engineering
Flood Control Sewer Rehabilitation Project - Forced Main Sewer Line Design, Lift Station, Construction Inspection
 
Project Description:

H&A provided wastewater system evaluation and recommendations regarding the rehabilitation of an antiquated sewer collection system for the Lake Siskiyou Campground. H&A reviewed previous reports and findings, and was able to recommend cost-effective alternatives saving over half a million dollars in construction costs.

Our services included the preparation of a preliminary facility plan and feasibility study, final design including retrofits to an existing pump station with a backup emergency generator, a new pump station, and forcemain pipeline. In addition, H&A provided construction management, inspection and contract administration services.

This project allowed the campground to remain open and avoided costly cleanups and fines associated with sanitary sewer overflows.