Beale Air Force Base, Sewer Lift Station, Marysville, CA
Civil-Environmental Engineering
Design Phase, Repair Wastewater Lift Station, Global Hawk, Building 1203
Project Description:

Haling & Associates, as part of a design-build team, provided engineering design services for the Repair Wastewater Lift Station, Global Hawk, Building 1203 at Beale AFB, CA. 

 

The project entailed the construction of a new sewage pump station consisting of rebuilding an existing 23 feet deep lift station with masonry block wall, roof, hoist etc.  The rebuilt station was sized at 12’x14’ with chopper pumps, 610 feet of force main, and 670 feet of new gravity influent pipeline with 3 new manholes.  There were existing drainage and local utilizes that were accommodated as well as the demolition of some existing structures.  The work was segregated into two distinct phases; design and construction. 

 

H&A performed engineering design to produce constructible plans and specifications.  The design drawings included:

 

1. Site plan of the project area.

 

2. New sewer layouts showing connection points, pump configuration, masonry block building, pipe sizes, routing, and general equipment specifications.

 

3.  Design drawings and specifications were provided at 35%, 65% and 95% submittals.  Design drawings were completed using ACAD 2000, converted into PDF format and followed Beale AFB conventional drawing standards.  Specifications were compatible with Construction Specifications Institute (CSI) standards.

 

At the 95 % version, H&A met with the Base personnel to conduct a pre-final design review meeting.  Based on comments received therein, H&A revised the design and submitted the final (100%) design to the Base.  The goal was to provide quality service to help expedite the design phase such that a Notice to Proceed (NTP) for construction could be issued.  The project has been successfully constructed.