Haling & Associates
Haling & Associates 
Environmental Engineering 
 
 
 
      Paradise Unified School District, Paradise,  CA
Project Summaries
Bus Wash, Oil/Water Separator & Building Design

Project Description:
Bus Wash

This project involved design and construction management of a new 2,100 square feet pre-engineered metal building for the maintenance of school buses. As the primary need was for bus washing, H&A designed and specified a building and power brush wash system with an onsite oil-water separator that discharged to a new leach field. Project services included design, permitting, preparation of construction specifications and bid documents, shop drawing review, and construction inspection. Bus Wash